The electricity engineer, Mr.Ishida came here for establishment and adjustment of the water power generator from AICHI Pref. from May 1 to 5th and from October 7 to 9th in 1999. We were introduced him from the customer who we guided the JOMON-SUGI (Japanese cedar). He shaved and adjusted the wheel of the water mill little by little in accordance with the quantity of water and a head. And finally the wheel matched to the quantity of water. At present, we are using the overflow of the water purification plant for power generation. However, electric power did not come out as we thought in this quantity of water. Therefore, we will pipe water to the place from the nearby river and increase the quantity of water. After that we intend to ask it to make a wide wheel to him again.

Adjustment of the wheel

(May 5, 1999)
@
Wheel

(May 4, 1999)

There is not so much power generation quantity in the present quantity of water. Also we require much maintenance to generate power. Therefore we feel an electric bounty more and more.

Ground plan of hydro power plant (unit = millimeter)

Our house